ARXX ICF - Redefining Building
Contact Us - 1.800.293.3210
HOME / DESIGN PROFESSIONALS / ARXX TESTING REPORTS

 

Testing Reports

 

Fire

4.02.01.01 - Fire Resistance Testing Report Summary
Summary of fire resistant testing (ASTM E119, CAN/ULC-S101, NFPA-251) for 2 to 4 hour ratings on ARXX wall assemblies. Intertek Warnock Hersey certification.

4.02.01.02 - Flame Spread Index (FSI) and Smoke Development Index (SDI) Testing Report Summary
Summary of FSI and SDI testing (ASTM E84, CAN/ULC-S102.2M) for compliance of ARXX ICF to building codes.

4.02.01.03 - Thermal Barrier Testing Report Summary
Summary of test of 1/2” gypsum board as a 15 minute thermal barrier per UBC Standard 26-3, UL1715 or CAN4-S124.

 

Sound

4.03.01.01 - Sound Testing Report Summary
Summary of sound testing (ASTM E336-90, ASTM E413-87) for ARXX wall assemblies with STC ratings from 50 to 75.

 

Air and Moisture

4.06.01.04 - Vapor Barrier Requirements and Permeance Testing Report Summary
Summary of the permeance characteristics of an ARXX wall meeting the requirements of the building code as a vapor barrier.

4.06.01.05 - Air Permeance Testing Report Summary
Summary of air infiltration testing (ASTME283) identifying that ARXX wall assemblies meet the requirements of the building code as an air barrier.

 

Engineering

4.05.01.01 - Below Grade Structural Comparison Study Report Summary
Summary of analysis for resistance to lateral loads on various below grade wall assemblies compared to an ARXX 6” form.

4.05.01.08 - Cold Weather Concreting
Summary of the placement of concrete in ARXX ICFs in cold weather conditions per ACI306.1.

4.05.03.01 - Fastener Testing Report Summary
Summary report of lateral and withdrawal capacities (ASTM D1761) of various fasteners into fastening strips of ARXX forms.

 

For assistance, please contact:

  • Technical Support (800) 293-3210 option 5 (Monday to Friday 8:30 am to 5:00 pm EST)
    or techsupport@arxx.com.
  • Customer Service (800) 293-3210 option 3 (Monday to Friday 8:30 am to 6:30 pm EST)
    or customerservice@arxx.com.

 

 
Featured Project

McAlester Army Ammunition Plant (MCAAP)

McAlester Army Ammunition Plant in Oklahoma has six ammunition production, maintenance and renovation complexes and is a major ammunition storage site for all branches of the Armed Forces. With nearly 2,300 storage magazines and six million square feet of covered explosive storage space, it is the DoD’s (Department of Defense) largest explosive storage facility.

Find Out More
View More Project Profiles

 

ARXX Corporation
Toll free: 1-800-293-3210
Tel: 905-373-0004
Fax: 1-888-672-1729